Loughborough University
Browse

File(s) under permanent embargo

Reason: This item is currently closed access.

A new project scheduling approach for improving multi-product multi-period production planning problems

journal contribution
posted on 2014-06-10, 15:26 authored by S. Noori, M. Bagherpour, F. Zorriassatine, A. Makui, Robert M. Parkin
The problem of matching production levels for individual products to demand fluctuations during multiple periods is known in the production planning literature as the multi-product multi-period (MPMP) problem. Linear programming (LP)-based solutions have been extensively reported in this respect.MPMP problems are commonly solved by using either analytic or simulation methods. More recently, hybrid solutions consisting of both analytical models and simulation analysis have been proposed where some operational criteria, e.g. the order of visit to machining centres, are taken into account. In this paper, results related to some of the literature based on hybrid solutions are used as the initial feasible solutions and then examined in the context of project scheduling by considering the influences of resource constraints. After converting the MPMP to a project network problem and assigning resources to activities and consequently levelling the resource profiles, it is discovered that machine utilization can be further improved by applying unused machine capacities. A LP model is therefore developed in order to maximize feasible production rates over all the production planning periods. The proposed approach results in improvements on the results of earlier hybrid solutions reported in the literature. Finally, three different planning problems are suggested for further applications of the proposed approach in the context of manufacturing environments.

History

School

  • Mechanical, Electrical and Manufacturing Engineering

Published in

PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE

Volume

222

Issue

11

Pages

1517 - 1527 (11)

Citation

NOORI, S. ... et al, 2008. A new project scheduling approach for improving multi-product multi-period production planning problems. Proceedings of the Institution of Mechanical Engineers Part B - Journal of Engineering Manufactire, 222 (11), pp.1517-1527.

Publisher

Sage (© IMechE)

Version

  • VoR (Version of Record)

Publication date

2008

Notes

This article is closed access.

ISSN

0954-4054

Language

  • en

Usage metrics

    Loughborough Publications

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC