Loughborough University
Browse
Performance measurement and KPIs for remanufacturing.pdf (910.44 kB)

Performance measurement and KPIs for remanufacturing

Download (910.44 kB)
journal contribution
posted on 2016-01-27, 11:55 authored by Ian GrahamIan Graham, Paul GoodallPaul Goodall, Yi Peng, Claire Palmer, Andrew WestAndrew West, Paul ConwayPaul Conway, Juliene E. Mascolo, Fritz U. Dettmer
The paper provides a brief background to remanufacturing and the general use of Performance Measurement and Key Performance Indicators (KPIs) before introducing selected and newly formulated KPIs designed specifically for remanufacturing. Their relationships with the remanufacturing challenges faced by two contrasting remanufacturing businesses and the wider reman industry are described in detail. Subsets of KPIs forming a ‘Balanced Scorecard’ for each of the two remanufacturing cases conclude the paper. They arise through close working with Centro Ricerche FIAT (CRF) and SKF, and are triangulated by literature review and wider expert interviews. The two businesses represent contrasting remanufacturing scenarios: well-established high-volume low-margin automotive engine remanufacturing by the OEM ( >1000 units per year, < €10 k per unit) verses low-volume high-value wind turbine gearbox reman by an independent start-up ( < 100 units per year, > €100 k per unit). The 10 general production engineering KPIs selected for the reman KPI toolbox are as follows: Work In Progress (WIP), Overall Equipment Effectiveness (OEE), Lead Time (LT), Cycle Time (CT), Hours Per Unit (HPU), Product Margin (PM), Quotation Accuracy (QA), Number of Concessions (NC), Number of managed mBOMs (BOM), and Personnel Saturation (PS). The Eco KPIs selected are: Material Used (MU), Recycled Material Used (RMU), Direct Energy Consumption (ECD), Indirect Energy Consumption (ECI), Water Withdrawal (WW), Green House Gas emissions (GHG), Total Waste (TW) by weight. The 8 Remanufacturing KPIs compiled and formulated as part of this research are: Core / Product Ratio (CPR), Core / Product Value Ratio (CPV), New Component Costs (NCC), Component Salvage Rate (SRC), Product Salvage Rate (SRP), Core Disposal Rate (CDR), Core Class Accuracy (CCA), and Core Class Distribution (CCD).

Funding

The PREMANUS project (1/9/11 to 30/6/15, grant agreement number 285541) is co-funded by the European Union under the Information and Communication Technologies (ICT) theme of the Seventh Framework Programme (FP7) for research, technological development and demonstration.

History

School

  • Mechanical, Electrical and Manufacturing Engineering

Published in

Journal of Remanufacturing

Volume

5

Issue

10

Citation

GRAHAM, I. ... et al., 2015. Performance measurement and KPIs for remanufacturing. Journal of Remanufacturing, 5:10.

Publisher

Springer International Publishing Ltd © the authors

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Full details of this licence are available at: http://creativecommons.org/licenses/ by/4.0/

Publication date

2015-11-23

Notes

© 2015 Graham et al. Open Access This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

eISSN

2210-4690

Language

  • en

Usage metrics

    Loughborough Publications

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC