Loughborough University
Browse
Abu_Ubaiddha_M.pdf (181.93 kB)

Premature saturation of water demand due to rapid urbanization

Download (181.93 kB)
conference contribution
posted on 2018-02-12, 15:08 authored by S. Abu Ubaiddha, M. Manoharan
Some water supply schemes in Sri Lanka very rapidly become unable to meet the demand imposed on them. This premature ‘saturation’ of the components of the water supply facilities such as intake, transmission main, treatment unit, storage reservoirs and distribution system are discussed in this paper. The reasons for it are that urbanization and industrial development are taking place at a higher rate than anticipated. As a general practice water supply schemes in Sri Lanka are designed for a 20-year life span. However most of the water schemes are saturated within a short duration. That is the 20-year design demand is reached within 4 to 5 years and the water supply infrastructure is unable to cope with the demand. This paper describes the background of these water supply schemes and causes for premature saturation. It also suggests concepts and preventive measures that can be used to overcome this problem, when designing water supply schemes in the future. The high growth in demand is a critical issue in most of the water supply schemes in Sri Lanka. Though the growth rate, migration, urbanization and industrial growth were considered, when designing the water supply schemes, the actual rate of increase in migration, urbanization and industrial growth are usually very much higher than the predicted levels. This results in them very quickly reaching their design capacity. A detail analysis was carried out of two of these schemes, to find the reasons for the problem and to propose suitable solutions. It is desirable to design a water supply scheme to cover all areas not yet likely to be developed but which are fed by the existing schemes. This is not practiced since the funds available are limited. Hence there is a tendency to limit the distribution area in order to make a scheme affordable. In the years following completion of the scheme the distribution system is often extended in all directions due to the pressure exerted on the water supply organization by the local political authority. This, coupled with the usual migration of people towards the water-served areas, leads to the premature saturation of the water supply facilities. The following optimal solution is suggested, considering all factors related to this issue. It is proposed that at the design stage all major demands are considered in consultation with all relevant institutions. The investment on the scheme can then be phased and the commissioning of the distribution areas staggered accordingly. Although it will take more time to complete the scheme in full, this will prevent the premature saturation of water schemes.

History

School

  • Architecture, Building and Civil Engineering

Research Unit

  • Water, Engineering and Development Centre (WEDC)

Published in

WEDC Conference

Citation

UBAIDDHA, S.A. and MANOHARAN, M., 2004. Premature saturation of water demand due to rapid urbanization. IN: Godfrey, S. (ed). People-centred approaches to water and environmental sanitation: Proceedings of the 30th WEDC International Conference, Vientiane, Laos, 25-29 October 2004, pp. 538-541.

Publisher

© WEDC, Loughborough University

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Publication date

2004

Notes

This is a conference paper.

Other identifier

WEDC_ID:11069

Language

  • en

Usage metrics

    WEDC 30th International Conference

    Categories

    No categories selected

    Keywords

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC