Loughborough University
Browse
Thesis-1987-AbdelRazek.pdf (6.47 MB)

Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences

Download (6.47 MB)
thesis
posted on 2018-03-26, 13:30 authored by Refaat H. Abdel-Razek
The two elements of a tender sum are the cost estimate and the mark-up. Variations in tenders can be attributed to inaccuracy in the estimate and variations in the applied mark-up. The weaknesses of current published literature are that the causes of the inaccuracy in the estimate or the variability in a mark-up are not defined in such a way that they can be analysed and evaluated. The inaccuracy of a cost estimate results from combining the inaccuracy of its constituent elements. Thus the inaccuracy of each element needs to be evaluated. The consequences of estimating inaccuracy and mark-up variability are inadequately described in current literature, which tends to assume that mark-up variability is negligible. This research addresses these weaknesses. [Continues.]

History

School

  • Architecture, Building and Civil Engineering

Publisher

© Refaat Hassan Abdel-Razek

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Publication date

1987

Notes

A Doctoral Thesis. Submitted in partial fulfilment of the requirements for the award of Doctor of Philosophy at Loughborough University.

Language

  • en

Usage metrics

    Architecture, Building and Civil Engineering Theses

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC