Loughborough University
Leicestershire, UK
LE11 3TU
+44 (0)1509 263171
Loughborough University

Loughborough University Institutional Repository

Please use this identifier to cite or link to this item: https://dspace.lboro.ac.uk/2134/12307

Title: Standardisation of specification driven buildings with serial and repeat order designs
Authors: Robinson, Adrian
Gibb, Alistair G.F.
Austin, Simon A.
Keywords: Client
Briefing
Design
Standardisation
Prefabrication
Issue Date: 2012
Publisher: Association of Researchers in Construction Management (ARCOM)
Citation: ROBINSON, A., GIBB, A.G. and AUSTIN, S.A., 2012. Standardisation of specification driven buildings with serial and repeat order designs. IN: Smith, S.D. (ed.) Proceedings of the 28th Annual Conference of Association of Researchers in Construction Management (ARCOM), Edinburgh, 3-5 September 2012, pp. 57 - 66.
Abstract: Government policy-makers are continuing to affirm the need for greater economies through standardisation. The benefits of standardisation seem straightforward: repeated designs offering economies through rationalisation and greater use of preassembled manufactured components as a result of a closer engagement with supply chains. However, a closer investigation of standardisation shows it to be more complex; individual client needs, unique site conditions, planning legislation, late contractor engagement, inadequate knowledge and intermittent manufacturer supply are some of the factors that conspire to limit the benefits of standardisation. This research, as part of an Engineering Doctorate study, examines repeat- and serial-order standardised buildings through multiple case studies where the reasons for their adoption are explored from various stakeholder perspectives. It tests existing theories from literature on standardisation in design and construction efficiency, with an emphasis on specification driven ‘non-iconic’ buildings. With one-off projects the benefits of standardisation are expected to be limited to efficiencies within a project, and there may be limited engagement with a supply-chain. On multiple projects, with dimensionally standard spaces, even in multi-stage tender situations, standardisation is also limited and clients are not strongly motivated to engage with manufacturing. However, there are other projects where clients, designers and contractors have taken an ‘enlightened self-interest’ to collaborate, particularly for repeat order projects, and this leads to an optimised process between the design team, the contractor and their supply chains. These latter projects have better defined briefs and benefit from successive refinements of more linear rationalised design processes with increased use of standardisation and preassembly, particularly for the more dimensionally standard areas of the buildings.
Description: This is a conference paper. The publisher's website is at: http://www.arcom.ac.uk/
Version: Published
URI: https://dspace.lboro.ac.uk/2134/12307
Publisher Link: http://www.arcom.ac.uk/-docs/proceedings/ar2012-0057-0066_Robinson_Gibb_Austin.pdf
ISBN: 978-0-9552390-6-9
Appears in Collections:Conference Papers (Civil and Building Engineering)

Files associated with this item:

File Description SizeFormat
ar2012-0057-0066_Robinson_Gibb_Austin.pdfPublished version169.24 kBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.