Title: Barriers to the implementation of Flexible Demand services within the GB electricity generation and supply system
Authors: Hodgson, Graeme
Keywords: Demand response
Flexible demand
Low carbon electricity
Combinatorial optimisation
Genetic algorithms
Enterprise relationship modelling
Issue Date: 2013
Publisher: © Graeme John Hodgson
Abstract: The implementation of a low carbon electricity system within the GB requires a significant change to the generation mix with an increasing role for renewable generation. Much of this generation will be intermittent. To date system balancing has largely relied on predicting demand and ensuring provision. With substantial intermittency, continuation of this paradigm necessitates significant investment in peaking plant and/or storage. However, some of this investment can be avoided by harnessing the flexibility inherent in many electrical loads. Despite the attractiveness of such services, we do not see their large-scale implementation. The aim of this thesis is to consider why. A historical analysis reveals that both nationalisation and subsequent privatisation provide precedents for significant structural change as the integration of large-scale flexible demand might require. The need for political will is identified as a crucial enabling factor. Without an ideological driver, however, a perception of economic and/or technological risk can preclude the implementation of supportive policy. This perception is addressed through demonstration. An effective demonstration must show the ability to aggregate many small loads in a coordinated manner. A genetic algorithm that provides this core dispatch and optimisation capability is presented. This algorithm is shown to be effective in aggregating many small loads to provide a net effect that can be used as a balancing service and to do so in an optimal way considering both cost and reliability. Having demonstrated feasibility appropriate incentives must be created. An initial outline for a framework based on SysML is presented that can be used to identify where structural barriers to implementation are present to aid the design of appropriate policy incentives.
Description: A Doctoral Thesis. Submitted in partial fulfillment of the requirements for the award of Doctor of Engineering of Loughborough University
Sponsor: EPSRC and E.ON New Build & Technology Ltd
URI: https://dspace.lboro.ac.uk/2134/13410
Appears in Collections:PhD Theses (Mechanical, Electrical and Manufacturing Engineering)

Files associated with this item:

File Description SizeFormat
Form-2013-Hodgson.pdf1.26 MBAdobe PDFView/Open
Thesis-2013-Hodgson.pdf3.47 MBAdobe PDFView/Open


SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.