Title: Implementing an offsite construction strategy: a UK contracting organisation case study
Authors: Vernikos, V.K.
Goodier, Chris I.
Nelson, R.
Robery, P.C.
Issue Date: 2013
Publisher: Association of Researchers in Construction Management (ARCOM)
Citation: VERNIKOS, V.K. ... et al., 2013. Implementing an offsite construction strategy: a UK contracting organisation case study. IN: Smith, S.D. and Ahiaga-Dagbui, D.D. (eds). Proceedings of the 29th Annual ARCOM Conference, Reading, UK, 2nd-4th September 2013, pp. 667 - 677.
Abstract: Many United Kingdom (UK) contractors only consider offering offsite solutions on a bespoke project-by-project basis, with very few having immediate plans for integrating fully offsite manufacturing as part of their core business strategy. Limited literature exists regarding how a major UK contractor could achieve such a strategic offsite capability, as this capability is usually referred to as an out-sourced, subcontracted activity. The concept of a major contractor providing its own capability and completing large scale infrastructure projects using offsite construction (OSC) methods is not common in the UK, although the concept is less rare in certain other countries, such as Australia. The aim of this paper is to determine the benefits that OSC can offer for UK contractors and to investigate how an offsite strategy can be implemented in practice. Semi-structured interviews were conducted with a major UK contractor, transcribed, and thematically analysed to determine how effectively the offsite strategy and methods were being implemented at different levels within the contractor’s operations. The potential attractiveness and future of offsite for major UK contractors is discussed. The paper concludes with three recommendations for contractors considering the development of offsite capability. First, commitment from senior leadership at a strategic level, second, clear communication to all level through the firm and third, investment in innovation.
Description: This is a conference paper. The publisher's website is at: http://www.arcom.ac.uk/
Version: Accepted for publication
URI: https://dspace.lboro.ac.uk/2134/14474
Publisher Link: http://www.arcom.ac.uk/-docs/proceedings/ar2013-0667-0677_Vernikos_Nelson_Goodier_Robery.pdf
ISBN: 9780955239076
Appears in Collections:Conference Papers (Civil and Building Engineering)

Files associated with this item:

File Description SizeFormat
Vasileios Vernikos-ARCOM2013 .pdfAccepted version97.54 kBAdobe PDFView/Open


SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.