Title: A new project scheduling approach for improving multi-product multi-period production planning problems
Authors: Noori, S.
Bagherpour, M.
Zorriassatine, F.
Makui, A.
Parkin, Robert M.
Keywords: Project scheduling
MPMP
Production planning
Machine profile
Issue Date: 2008
Publisher: Sage (© IMechE)
Citation: NOORI, S. ... et al, 2008. A new project scheduling approach for improving multi-product multi-period production planning problems. Proceedings of the Institution of Mechanical Engineers Part B - Journal of Engineering Manufactire, 222 (11), pp.1517-1527.
Abstract: The problem of matching production levels for individual products to demand fluctuations during multiple periods is known in the production planning literature as the multi-product multi-period (MPMP) problem. Linear programming (LP)-based solutions have been extensively reported in this respect.MPMP problems are commonly solved by using either analytic or simulation methods. More recently, hybrid solutions consisting of both analytical models and simulation analysis have been proposed where some operational criteria, e.g. the order of visit to machining centres, are taken into account. In this paper, results related to some of the literature based on hybrid solutions are used as the initial feasible solutions and then examined in the context of project scheduling by considering the influences of resource constraints. After converting the MPMP to a project network problem and assigning resources to activities and consequently levelling the resource profiles, it is discovered that machine utilization can be further improved by applying unused machine capacities. A LP model is therefore developed in order to maximize feasible production rates over all the production planning periods. The proposed approach results in improvements on the results of earlier hybrid solutions reported in the literature. Finally, three different planning problems are suggested for further applications of the proposed approach in the context of manufacturing environments.
Description: This article is closed access.
Version: Published
DOI: 10.1243/09544054JEM1081
URI: https://dspace.lboro.ac.uk/2134/14807
Publisher Link: http://dx.doi.org/10.1243/09544054JEM1081
ISSN: 0954-4054
Appears in Collections:Closed Access (Mechanical, Electrical and Manufacturing Engineering)

Files associated with this item:

File Description SizeFormat
MPM project scheduling Dec08.pdfAccepted version232.84 kBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.