Loughborough University
Leicestershire, UK
LE11 3TU
+44 (0)1509 263171
Loughborough University

Loughborough University Institutional Repository

Please use this identifier to cite or link to this item: https://dspace.lboro.ac.uk/2134/15053

Title: Measurement of construction productivity: brickwork and blockwork Part B
Authors: Jayawardane, A.K.W.
Price, Andrew D.F.
Harris, F.C.
Keywords: Brickwork and blockwork productivity
Activity sampling
Basic and standard times
Issue Date: 1995
Publisher: © Taylor & Francis
Citation: JAYAWARDANE, A.K.F., PRICE A.D.F. and HARRIS, F., 1995. Measurement of construction productivity: brickwork and blockwork Part B. Building Research and Information, 23 (3), pp. 147 - 155.
Abstract: The assumptions in Part A of this paper were tested by analysing the data shown in the tables using the MINITAB package. Brickwork and blockwork were analysed separately in four main steps, namely: correlation, graphs, variance tests and regression analysis.
Description: Closed access.
Version: Published
DOI: 0.1080/09613219508727448
URI: https://dspace.lboro.ac.uk/2134/15053
Publisher Link: http://dx.doi.org/10.1080/09613219508727448
ISSN: 0961-3218
Appears in Collections:Closed Access (Civil and Building Engineering)

Files associated with this item:

File Description SizeFormat
J32 Jayawardane, A.K.W., Price, A.D.F. and Harris, F.C., “Measurement of Construction Productivity Brickwork and Blockwork Part B”, Building Research and Informati.pdfPublished version667.73 kBAdobe PDFView/Open


SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.