Loughborough University
Leicestershire, UK
LE11 3TU
+44 (0)1509 263171
Loughborough University

Loughborough University Institutional Repository

Please use this identifier to cite or link to this item: https://dspace.lboro.ac.uk/2134/19892

Title: Optimizing the performance of sub-contractors in building construction projects in Hong Kong
Authors: Ng, Andy K.W.
Price, Andrew D.F.
Keywords: Performance
Sub-contractors
Success factors
Issue Date: 2002
Publisher: © ARCOM / © the authors
Citation: NG, A.K.W. and PRICE, A.D.F., 2002. Optimizing the performance of sub-contractors in building construction projects in Hong Kong. IN: Greenwood, D. (ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 2, pp.811–819.
Abstract: The performance of sub-contractors directly affects the outcomes of most construction projects. However, sub-contractors are sometimes unable to perform in their full capacity due to unfavourable project environment and poor quality of management by the main contractor. In-depth interviews to the management and front line staff, of the main contractor and the sub-contractors have been conducted to identify the major factors governing the performance of the sub-contractors in the building construction projects in Hong Kong.
Version: Published
URI: https://dspace.lboro.ac.uk/2134/19892
Publisher Link: ttp://www.arcom.ac.uk/-docs/proceedings/ar2002-811-819_Ng_and_Price.pdf
ISBN: 0953416178
Appears in Collections:Conference Papers (Civil and Building Engineering)

Files associated with this item:

File Description SizeFormat
Optimising the performance of subcontractors in building construction projects in Hong Kong.pdfPublished version50.27 kBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.