Loughborough University
Browse
J1 Broomfield Production analysis applied to work improvement.pdf (351.57 kB)

Production analysis applied to work improvement

Download (351.57 kB)
journal contribution
posted on 2016-12-09, 09:31 authored by J.R. Broomfield, Andrew Price, Francis C. Harris
This Note provides and introduction to the research being carried out in the Department of Civil Engineering at Loughborough University and funded by the Science and Engineering Research Council (SERC) into Work Study applied to construction work. The emphasis is directed towards ascertaining site efficiency factors and the methods of determining operation times. In subsequent notes the measuring techniques will be explained in detail and examples of typical data for us in estimating and cost control described.

Funding

SERC.

History

School

  • Architecture, Building and Civil Engineering

Published in

Proceedings of Institution Civil Engineers, Part 2

Volume

44

Pages

379 - 386

Citation

BROOMFIELD, J., PRICE, A. and HARRIS, F., 1984. Production analysis applied to work improvement. Proceedings of Institution Civil Engineers, 77 (3), pp.379-386.

Publisher

© ICE

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Publication date

1984

Notes

See also: HORNER, R. and WHITEHEAD, R., 1985. Discussion on Technical Note 415: Production analysis applied to work improvement. Proceedings of the Institution of Civil Engineers, 79 (2), pp.431-433. DOI: http://dx.doi.org/10.1680/iicep.1985.1009.

eISSN

1753-7789

Book series

Technical Note (Institution of Civil Engineers) ; 415

Language

  • en

Usage metrics

    Loughborough Publications

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC