Loughborough University
Leicestershire, UK
LE11 3TU
+44 (0)1509 263171
Loughborough University

Loughborough University Institutional Repository

Please use this identifier to cite or link to this item: https://dspace.lboro.ac.uk/2134/23888

Title: Estimating design costs: the data dilemma
Authors: Blackwood, David J.
Price, Andrew D.F.
Keywords: Construction industry
Design management
Issue Date: 1993
Publisher: Conseil International du Bâtiment
Citation: BLACKWOOD, D. and PRICE, A., 1993. Estimating design costs: the data dilemma. IN: Proceedings of 1993 International Symposium on Architectural and Project Management (CIB-W49 commission), Eindhoven, Netherlands, 1993, pp.51-57.
Abstract: This paper is concerned with the implications to design professionals in the construction industry of the increased use by clients of fee competition in the procurement of professional services. In particular the need to accurately estimate the cost of these services is identified and a methodology which has been developed to provide data for developing cost estimates and improving estimating skills amongst design managers is described.
Version: Published
URI: https://dspace.lboro.ac.uk/2134/23888
Publisher Link: http://www.cibworld.nl/site/home/index.html
Appears in Collections:Conference Papers (Civil and Building Engineering)

Files associated with this item:

File Description SizeFormat
23888.pdfPublished version9.94 MBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.