Loughborough University
Leicestershire, UK
LE11 3TU
+44 (0)1509 263171
Loughborough University

Loughborough University Institutional Repository

Please use this identifier to cite or link to this item: https://dspace.lboro.ac.uk/2134/26430

Title: Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM
Authors: Akponeware, Anderson O.
Adamu, Zulfikar A.
Keywords: Clash detection
Clash avoidance
Design coordination
MEP coordination
Co-creation
Common data environment
Issue Date: 2017
Publisher: MDPI © The authors
Citation: AKPONEWARE, A.O. and ADAMU, Z.A., 2017. Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM. Buildings, 7 (3), 75.
Abstract: Early collaboration is crucial if the final design is to be clash-free, and automation processes through Building Information Modelling (BIM) have the capacity to reduce clashes through 3D design coordination. Yet, current design practices are still dependent on clash detection and contemporary literature presents several reasons for this. This paper investigates the root causes of clashes with respect to achieving “clash avoidance” as proposed in PAS 1192-2 design phase specifications for BIM in the UK. Empirical data from BIM coordinators around the world was collected and analyzed using explanatory sequential mixed-methods. It was found that: (i) isolated working was the prime cause of high occurrences of clashes linked to mechanical, electrical and plumbing (MEP) 3D BIM systems; (ii) there is a link between non-BIM specific training (or the professional qualifications) of design practitioners with the high incidence of clashes; and (iii) the current structure of cloud-based common data environments (CDEs) does not facilitate clash avoidance and in fact, encourages isolated working in the early design stage by creating “digital information silos”. A conceptual framework for an open work in progress (OWIP) has been proposed to address this problem. These findings point to the need for more transparency during collaboration through CDE where designers from multidisciplinary backgrounds can engage in concurrent co-creation. This transparent and inclusive process could have consequences on how future architectural, engineering and construction (AEC) professionals are trained.
Description: This is an Open Access Article. Is is published by MDPI under the Creative Commons Attribution 4.0 Licence (CC BY). Full details of this licence are available at: http://creativecommons.org/licenses/by/4.0/
Version: Published
DOI: 10.3390/buildings7030075
URI: https://dspace.lboro.ac.uk/2134/26430
Publisher Link: https://doi.org/10.3390/buildings7030075
Appears in Collections:Published Articles (Architecture, Building and Civil Engineering)

Files associated with this item:

File Description SizeFormat
Clash detection or clash avoidance- An investigation into coordination problems in 3D BIM.pdfPublished version3.45 MBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.