Building information modelling for construction delay management

Download (323.93 kB)
journal contribution
posted on 2018-02-07, 11:11 authored by Essa Alenazi, Zulfikar A. Adamu
The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays. It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management. A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

History

School

  • Architecture, Building and Civil Engineering

Published in

International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering

Volume

11

Issue

6

Citation

ALENAZI, E. and ADAMU, Z.A., 2017. Building information modelling for construction delay management. International Journal of Civil, Environmental, Structural, Construction and Architectural Engineering, 11 (6), pp. 802-813.

Publisher

© World Academy of Science, Engineering and Technology (WASET)

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) licence. Full details of this licence are available at: http://creativecommons.org/licenses/by-sa/4.0/

Publication date

2017

Notes

This is an Open Access Article. It is published by World Academy of Science, Engineering and Technology (WASET) under the Creative Commons Attribution-ShareAlike 4.0 International Licence (CC BY-SA). Full details of this licence are available at: http://creativecommons.org/licenses/by-sa/4.0/. This paper was also presented at the 19th International Conference on Advanced Civil Engineering Technologies (ICACET 2017), Dubai, UAE, 28-29 June 2017.

Language

  • en

Usage metrics

    Loughborough Publications

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC