Title: Climate and construction delays: Case study in Chile
Authors: Ballesteros-Perez, Pablo
del Campo-Hitschfeld, Maria Luisa
Gonzalez-Naranjo, Manuel Alejandro
Gonzalez-Cruz, M. Carmen
Keywords: Planning
Construction management
Productivity rate
Data analysis
Decision support systems
Construction works
Issue Date: 2015
Publisher: © The authors. Published by Emerald
Citation: BALLESTEROS-PEREZ, P. ...et al., 2015. Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621.
Abstract: Purpose: Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study. Design/methodology/approach: By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed. Findings: Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate. Research limitations/implications: Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries. Practical implications: The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays. Originality/value: Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.
Description: This is an Open Access Article. It is published by Emerald under the Creative Commons Attribution 4.0 Unported Licence (CC BY). Full details of this licence are available at: http://creativecommons.org/licenses/by/4.0/
Sponsor: This research study was funded in Chile by CONICYT under the Programs Fondecyt de Iniciación en investigación 2013 (project number 11130666) and FONDEF IDeA 2 etapas (project number ID14I10026).
Version: Published
DOI: 10.1108/ECAM-02-2015-0024
URI: https://dspace.lboro.ac.uk/2134/32768
Publisher Link: https://doi.org/10.1108/ECAM-02-2015-0024
ISSN: 0969-9988
Appears in Collections:Published Articles (Architecture, Building and Civil Engineering)

Files associated with this item:

File Description SizeFormat
ArtculoECAM001.pdfPublished version778.41 kBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.