Climate and construction delays: Case study in Chile

Download (778.41 kB)
journal contribution
posted on 2018-04-30, 13:38 authored by Pablo Ballesteros-Perez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro Gonzalez-Naranjo, M. Carmen Gonzalez-Cruz
Purpose: Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study. Design/methodology/approach: By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed. Findings: Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate. Research limitations/implications: Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries. Practical implications: The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays. Originality/value: Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.

Funding

This research study was funded in Chile by CONICYT under the Programs Fondecyt de Iniciación en investigación 2013 (project number 11130666) and FONDEF IDeA 2 etapas (project number ID14I10026).

History

School

  • Architecture, Building and Civil Engineering

Published in

Engineering, Construction and Architectural Management

Volume

22

Issue

6

Pages

596 - 621

Citation

BALLESTEROS-PEREZ, P. ...et al., 2015. Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621.

Publisher

© The authors. Published by Emerald

Version

  • VoR (Version of Record)

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Publication date

2015

Notes

This is an Open Access Article. It is published by Emerald under the Creative Commons Attribution 4.0 Unported Licence (CC BY). Full details of this licence are available at: http://creativecommons.org/licenses/by/4.0/

ISSN

0969-9988

Language

  • en