Loughborough University
Browse
1/1
2 files

An analysis of stocking strategy in a multi-echelon assembly system by computer modelling

thesis
posted on 2018-05-14, 09:19 authored by Peter D. Laurence
The business problem described is typical of the professional electronics industry, where product customisation is achieved by assembly to order, but the relatively short delivery lead times demanded by the market imply a high degree of speculation both in material procurement and manufacturing. The research objectives were to establish a methodology by which the influence of buffer stocks within the above environment could be observed, with particular reference to their contribution to delivery performance. [Continues.]

History

School

  • Mechanical, Electrical and Manufacturing Engineering

Publisher

© P.D. Laurence

Publisher statement

This work is made available according to the conditions of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) licence. Full details of this licence are available at: https://creativecommons.org/licenses/by-nc-nd/4.0/

Publication date

1984

Notes

A Doctoral Thesis. Submitted in partial fulfilment of the requirements for the award of Doctor of Philosophy at Loughborough University.

Language

  • en

Usage metrics

    Mechanical, Electrical and Manufacturing Engineering Theses

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC