Loughborough University
Leicestershire, UK
LE11 3TU
+44 (0)1509 263171
Loughborough University

Loughborough University Institutional Repository

Please use this identifier to cite or link to this item: https://dspace.lboro.ac.uk/2134/6075

Title: FESTA. D2.5. Planning and running a field operational test: FOT implementation plan
Authors: Richardson, John H.
FESTA Consortium
Issue Date: 2008
Publisher: © FESTA
Citation: FESTA WP 2.5 PROJECT TEAM, 2008. FESTA. D2.5. Planning and running a field operational test: FOT implementation plan.
Abstract: For a Field Operation Test (FOT) to proceed smoothly, a plan of action must be developed which documents the scientific, technical, administrative and procedural activities and tasks that are needed to successfully complete it. Given that the lifecycle of a FOT typically evolves through many phases, there are many issues to consider. In this report, the critical activities and tasks which are necessary to run a successful FOT are documented — in the form of a “FOT Implementation Plan” (FOTIP) — drawing on lessons learned from previous FOTs conducted in Europe, the United States, Japan, Australia and elsewhere.
Description: Please see report for full list of authors. This report is also available at http://www.its.leeds.ac.uk/festa/downloads.php
Version: Published
URI: https://dspace.lboro.ac.uk/2134/6075
Publisher Link: http://www.its.leeds.ac.uk/festa/downloads.php
Appears in Collections:Official Reports (Design School)

Files associated with this item:

File Description SizeFormat
AR2603 D2 5 Planning and running a field operational test.pdf569.7 kBAdobe PDFView/Open

 

SFX Query

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.